§ 14.04.410. Turn-on after installation—Prior payment required.  


Latest version.
  • When tap or connection is made and work completed as provided in this chapter, the same shall be tested and, when found sufficient, the water shall be shut off at the stopcock until the owner of the premises produces to the director of public works and natural resources a receipt for the owner's water rates for the current period. No water shall be turned on for any premises, house, building or lot until the water rate for the current period has been paid according to the uses called for in the permit.

(Code 1981, § 8-1-15; Code 1993, § 14.04.410; Ord. No. O-93-33, § 27; Ord. No. O-2015-09, § 23, 1-27-2015)